Skip to main content

Power supply

Connect the 1 or 3 phase power supply behind a 6A circuit breaker, or use an existing circuit.

For an installation with a single energy meter (known as a PAP, a primary allocation point), the following installation diagram should be implemented. The Currentt Navigator Pro has internal fuses, but it is recommended to install the Navigator behind an existing circuit breaker or residual current device.

Wire gauge

Use wire with a cross-section of 0.75 mm² to 2.5 mm² (stranded or solid core). The connection method is push-in with a recommended strip length of 10 mm. Ferrules can be used but are not required.

Navigator connection diagram with single meter (PAP)